Case Studies
Bleasdale Steet
Stabilisation and Solidification treatment of 2700m3 typical gasworks wastes found and contained in the bottom 2 historic gasholder bases.
Poulton-Le-Fyde
A former town gasworks, the site at Station Road had stood derelict for a number of years, constrained by contamination from it’s historic use and the route of a high pressure gas main bisecting the site.
Watery Road, Wrexham
This 1.9 acre 80 unit development comprising a mix of two storey domestic dwellings, associated gardens, and a six storey residential apartment block incorporating areas of public open space, proved an interesting challenge.
Winnington Urban Village
Stabilisation and Solidification treatment of 3000m3 hazardous levels TPH, ammoniacal nitrogen, cyanides, PAHs and heavy metals.